West-East Gas Pipeline Project

West-East Gas Pipeline Project

China’s longest natural gas transmission pipeline — over 8,000 km — protected by Jiayu’s anti-corrosion solutions across multiple terrains and climate zones.

Project Overview

Project NameWest-East Gas Pipeline (Line 1, 2, and 3)
LocationChina — from Xinjiang in the west to Shanghai and Guangdong in the east
Total LengthApproximately 8,700 km across all three lines
ClientPipeChina / PetroChina (National Pipeline Network Group)
Project PeriodLine 1: 2002-2004 | Line 2: 2008-2012 | Line 3: 2012-2016 (Jiayu supplied across all phases)

Project Background

The West-East Gas Pipeline is China’s largest and most strategically important natural gas transmission project. It traverses diverse and challenging terrains — including the Gobi Desert, the Loess Plateau, mountain ranges, river crossings, and densely populated coastal areas. Ensuring long-term corrosion protection for this critical energy artery was a top priority for the pipeline owner.

Challenges

  • Extreme terrain diversity — Desert sand abrasion, rocky mountain conditions, and water-saturated river crossings required versatile coating solutions
  • High operating pressure and temperature — Coatings had to maintain adhesion and sealing performance under demanding operating conditions
  • Stringent quality requirements — The project required materials meeting ISO 21809-3 and GB/T 23257 standards
  • Large-scale, fast-paced construction — High-volume material supply and on-time delivery across multiple construction sections simultaneously

Jiayu’s Solutions

Jiayu provided a comprehensive range of pipeline anti-corrosion materials for the West-East Gas Pipeline, including polyethylene anti-corrosion tape (three protection levels), heat shrinkable sleeves for field joint coating, visco-elastic tape and paste for flange and valve protection, solvent-free epoxy primer, and repair patches for field coating repairs.

[Image: Application of heat shrink sleeve or anti-corrosion tape on West-East Gas Pipeline]

Results

  • Reliable long-term protection — Jiayu’s anti-corrosion materials have performed reliably since Line 1 completion in 2004, with continued use on Lines 2 and 3
  • Compliance with international standards — All materials met ISO 21809-3 and GB/T 23257 requirements, with third-party test reports provided
  • Large-volume supply — Over 5,000 km of anti-corrosion tape supplied across all three lines, with on-time delivery to multiple construction sites
  • Technical support — Jiayu provided on-site technical assistance for coating application and quality inspection

Need a Similar Solution for Your Pipeline Project?

Our team has extensive experience supplying anti-corrosion materials for large-scale, high-standard pipeline projects. Contact us to discuss your project requirements.

Contact Our Expert →

Newsletter Updates

Enter your email address below and subscribe to our newsletter